Monday, November 10, 2008


At last we have some better weather enabling work to start on the rendering. This encompasses an initial coat in grey, a second thicker coat and finally the coloured top coat. There is a tableau around the doors and windows in a paler colour. This whole process by hand could take a while!

Already the gites are showing signs of change!


We are now pretty much settled into the house although the number of boxes we have unpacked seems never ending, some of these have not been opened since we moved here 3years ago.



Martin is staying with us for the week and in between work duties we will take a little time out to relax! Sunday we went to Fontaine de Vaucluse, the fountain of the Vaucluse, a natural water source that we last visited 18 months ago when we could walk deep into the cliff where the source originates from, it was virtually dry.Now it is a dep , intense and power full source of water feeding into the Sorgue river, popular for canoeing and kayaking.



Yesterday was rememberance Sunday in the UK, it is a bank holiday here Tuesday on the 11 so many people have taken a long weekend and it was incredibly busy with every restaurant packed.


We couldn't even get a beer!


Martin and Karen looking relaxed before they realised we could not get served in the bar!

Thursday, November 06, 2008


CONTRASTS!!!
I took this picture today, 6th November, it rained again for much of the day. We have had 950mm of rain this year compared with 520 last year. Its our 5th day in the house and the builders are trying to render with the rain making it a very unpleasant job!
It is 3 years to the day since I took the second picture. We had just viewed the land that started the dream that is now evolving. The house is fabulous despite one or two teething issues, we can both envisage the pool completed in front of the gites, Le Chene is taking shape too.



What is extrordinary is the change in this years weather. Winter 2005/6 was very cold and dry, our first here. Late spring 2008 was one of the wettest on record, mainly May/early june, a hot summer followed,broken by the current wet Autumn. Instead of red trees they are yellow, less prolific in colour and it is so wet.Who knows what winter will bring. Normally we pick olives late november/early December in biting cold temperatures. This recent spell of weather, bought on the back of a Tramuntana wind, has taken most of the leaves off the trees and is playing havoc with the vines, fruit trees and Olive Harvest let alone our souls!! The difference in the land scape in the 3 years is extraordinary. The second picture of Karen was taken 6/11/2005 and the third 20/11/2005.

Sunday, November 02, 2008


Well it has been quite a week (again!), 3 weeks ago we gave Thijs, our builder, a deadline that we wanted to move in the house by the end of October. And in fairness he and the other trades have done all they could to get us set up for this.

This meant he would finish all the internal work leaving them the job of rendering the exterior in the coming months,this is a long job as they apply 3 coats all by hand and is also governed by the weather, can't do it when its raining, freezing and through the summer when its too hot so the opportunities can be limited!

We had plannd to gradually move in over the last week but every where we went there was either a tiler, plumber or builder all of whom came in wearing mud covered boots - great!

Thursday seemed a good day to start moving our belongings from the gite in, by late in the day we noticed our hot water was , well no longer hot, so we called the plumber who arrived at 7-30pm, the problem was qickly identified - as we have had no sun for 4 days - yes its true - the back up for the solar panels should have clicked in but it was dis-connected!

Friday it rained all day again, in the evening there was a high pitched screach coming from the 'Abri' where all the techno stuff is - again had to call the plumber - this time an air lock had caused a pump to seize!

Saturday we decided it was time to push ahead moving in, I wired up the TV & satelite system - nothing no signal! called the Electrician who deflected the blame to the satelite installers but is Toussaints holiday and every where is shut so it will have to wait till Monday.

And so November 1st we finally get to sleep in the house. Some 3 years since we first saw the land. Unfortunately we noticed the heating is getting cooler! the pompe achaleur (heat pump) is not working. A Mistral has also blown up through the evening so or shutters are banging as they are not yet fixed properly so the firt night is far from restful - I am outside with a torch at 2am trying to secure the shutters so we can sleep!

Today Sunday we have cleaned and unpacked - the wind has not subsided and now a huge storm has started with torrential rain and lghtening - oh joy!

On a lighter note this was in the paper the other day


'French train passenger was trapped after reaching into the toilet for his cell phone.
27 October 2008
   
BORDEAUX - A French man became trapped while trying to retrieve his mobile phone from the toilet on a high-speed train, forcing firefighters to cut through the pipe to free him, passengers said.
   
"He came out on a stretcher, with his hand still jammed in the toilet bowl, which they had to saw clean off", said Benoit Gigou, who witnessed Sunday's rescue on board the 16h47 train from La Rochelle to Bordeaux, in western France.
   
The service was delayed for two hours after the 26-year-old passenger, hunting for his lost telephone, was drawn into the toilet by the powerful suction system which drains the toilets, the rail network's regional office said.

Saturday, October 25, 2008



Unfortunately when it rains in Provence it really rains, Wednesday was no exception , and with the builders all working inside the house together with the plumbers there was no room for us so we took off for lunch and an afternoon wine tasting with the New Zealanders who have been staying in Les cypres for the last 6 weeks. We returned to find Thijs had installed our Wood burner, he was particularly pleased to have beaten the plumber in giving us some heat!




The problem after the rain is the mud, which goes every where, beleive me it is no fun living on site in the rain!



We have just learnt that the company doing our pool have gone under or should I say sunk!! Thank fully Greg here has taken over and seems to be doing a good job.



Ali is closing in the chimney which will be plastered Monday ready for us to paint - I thought we had finished the Lounge!




Our Terracuit floors have been laid in the Hall and study.Toilet should be finished Monday.




Thank goodness the sun is back out today, 22 degrees although going to be 8 by wednesday and as yet we still do not have any proper heating in the house. We are planning to move in Wenesday /Thursday of next week.

Tuesday, October 21, 2008

A huge amount has been going on over the last 10 days. Our house is fast becoming a home! the floor is finished in the lounge and dining room, both upstairs bathrooms are almost finished, our dressing room rather prematurely has clothes hanging in it and the front door now closes seamlessly! Even the wine cellar is being stocked!
But it has not been with out its problems, our long standing Austrian worker Johann knocked open a water valve causing the bath taps to pour water into the bath which over flowed causing a nice water feature in the lounge ceiling!



The pool at Le Chene day 2!


The company building our pool in Le Chene appear to have gone bust after starting , so we are now trying to sort out who this chap is that has turned up and is building the pool, not with out demanding money though!

The Electrician assures me he has almost completed wiring Le Chene!



And the plasterer starts work tomorrow!



The pool has been assembled and concrete is then poured around it, we are then going to raise the ground level in line with the pool height.



My Cave - still with plenty of space for more!



Our fireplace is being installed in our lounge which we hope will be finished by Friday as we are planning to move in next week, as yet we also have no heating, again all due by Friday!



And finally I had two clients out viewing houses around Menerbes and Bonnieux so took time out to capture the Autumn colours.

Tuesday, October 14, 2008

We had a few words with our builder and have given a deadline to move in the the house by the end of October, just 4 months behind schedule.It seems to have had a very positive effect with lots of progress this week so far.



This is my cellar, the perimiter will take the wine racks whilst pebbles in the centre allow the floor to breath.







At Le Chene the swimming pool is being constructed.In a matter of hours it is taking shape.


Our Dining room floor is at last being tiled.



And progresses remarkably rapidly




The shutters are being added, the plasterer starts tomorrow, the Electrician is almost finished.

Sunday, October 05, 2008


Sunday - A nightmare for any Frenchman!- at 11-20 our boulangerie had run out of bread unheard of! so we headed to the market in Coustellet where word had clearly spread! Spot me in the queue - no that is not me in red with the bag!



Another lovely day, the tips of the cherry trees are turning red as are the vines.

Le Chene will change hugely in the coming weeks and months. The Electrician and Plumber has just about finished, the plasterer starts Monday week as do the company installing the swimming pool, that just leaves the rendering (enduit) and Karen and I to do the decorating during January & February, the garden will be landcaped in Spring ready for guests in May!

Friday, October 03, 2008

Have not had the chance to update lately - simply too much going on! The second house, now called Le Chene, is going well. Here the terraces are shuttered before the concrete is poured.



The hole forms part of the sceptic tank drainage system. Note the chateau in the top left.


Most of the activity in our house has been concentrated on the interior with our bathroom tiled and ready to receive its sanitory ware ( which is not yet in stock!)


Last weekend we took the weekend out to celebrate our 3rd anniversary of landing in France and were joined by Ian & Sheena and Neil & Karen. We managed to squeeze in a few sites (and glasses of wine too) . Sheena took this of us at Gordes- don't give up your full time job Sheena!



We currently have New Zealanders staying in Les Cypres for 6 weeks, they are a really nice and very hospitable bunch so we had a bbq and christened the terrace - our first do before we even live in the house - not sure the neighbour was too impressed!



The terraces are poured on both Le Chene and our own house - changes are happening!




The weather is still lovely in the day about 22 degrees but cooler at night down to 5 tonight and still no sign of our Heat pump so no heating!


The last few days I have been consumed by paperwork having to produce for our accountant every receipt for every detail on the construction of both house! oh joy! I am actually looking forward to going back to my sander next week!

Wednesday, September 17, 2008


The walls are built on Le Chene to retain the terraces.

Well our house is starting to look like a home with the kitchen being fitted this week. These are the work tops being trimmed to fit.More dust!

Sunday, September 14, 2008

I think I have worked out why the French are so protective of their 35 hour working week.we have just bought a car that has been imported from Germany. We have to register it here in the area we live. And so we went to the 'prefecture' in Apt last friday morning at 8-30 am, the office we had been told dealt with such formalities. We were promptly told we were in the wrong place and instead should be at our local Marie which does not open until 1pm. So we went to one of the builders merchants to sort some floor tiles which took almost two hours by the time the chap repeated himself half a dozen times (at least it helps us understand!)and so an early lunch then off to the Marie. We arrive to be told we need an import exemption certificate! where do we get that? Apt at the Impot Office next to the Prefecture!So we head back, they of course are at lunch till 2-30 by which time there is a large queue. We sit and wait, as each new person arrives the entire queue nod and acknowledge each other with Bonjour. I wander off to explore the building only to find a desk with a sign above it 'import certificates'!no queue! so we gt our certificate and sneek out the building to avoid being seen by the 'queue'.And back to the Marie, by this time it is 5pm , and of course we have to wait a month for the documents to arrive. So that is a working day lost to administration - so French - yet we love it.


Meanwhile work slowly continues with the foundations for the terraces in front of the lower house under way with the pool being installed in just 4 weeks time!



In our house we were joined by Martin, who answered our advert for painting holidays in Provence! In exchange for food and wine he spent the entire week with us painting the hall stairs and landing as well as the second bedroom - much appreciated.



As often happens when Martin comes the El Perry effect clicked in with the weather, another dramatic storm deposting 60mm of rain in under two hours, just what we needed! this was Thursday morning

Thursday, September 04, 2008


Our 10 week spell of sunshine was well and truly broken last night when at 1am we were a woken by torrential rain,lightening and thunder. 50mm of rain fell in two hours, a thunderbolt hit closeby knocking out our electricity and phone lines.
Our builders were still on site at 7am turning our plot into what looked more like a speedway track!
When our pool was dug out monday & Tuesday some Clay was found so we took the decision to cover the floor area with concrete to prevent water getting into the clay which could cause problems later, luckily we managed to get this laid Wednesday morning and dry before the rain came.






Today the foundations were prepared for the pool house.