Tuesday, October 02, 2007
Our relationship with our Irish Neighbour has deteriorated further. She has placed a rather large rock in an attempt to stop us getting materials on to the site. However a better photograph would be her face when she saw the lorry turn up with our blocks and Thijs bring his fork lift truck up and collect them avoiding her blockage! The only person really suffering is the onward neighbour, who's drive she has totally blocked although he does have an alternative access.
Meanwhile building progresses, we have mains water, Electricity and drainage. This is our house with the blocks delivered today which will be the outside walls.
And this is the second house with the sub floor and basement, the concrete floors will be poured next week then walls start going up with the prediction that the roof will be on by Christmas and the windows will be in.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment