A huge amount has been going on over the last 10 days. Our house is fast becoming a home! the floor is finished in the lounge and dining room, both upstairs bathrooms are almost finished, our dressing room rather prematurely has clothes hanging in it and the front door now closes seamlessly! Even the wine cellar is being stocked!
But it has not been with out its problems, our long standing Austrian worker Johann knocked open a water valve causing the bath taps to pour water into the bath which over flowed causing a nice water feature in the lounge ceiling!
The pool at Le Chene day 2!
The company building our pool in Le Chene appear to have gone bust after starting , so we are now trying to sort out who this chap is that has turned up and is building the pool, not with out demanding money though!
The Electrician assures me he has almost completed wiring Le Chene!
And the plasterer starts work tomorrow!
The pool has been assembled and concrete is then poured around it, we are then going to raise the ground level in line with the pool height.
My Cave - still with plenty of space for more!
Our fireplace is being installed in our lounge which we hope will be finished by Friday as we are planning to move in next week, as yet we also have no heating, again all due by Friday!
And finally I had two clients out viewing houses around Menerbes and Bonnieux so took time out to capture the Autumn colours.
No comments:
Post a Comment